News News
Contact Us

Email: sales@semgfab.com
Tel: +86-755-23093820 
Fax:+86-755-27233289

  • Your present position: Home News
2 Installation Precautions(1) Do Not Use The Capacitor That Has Been Energized On The Device. Except For Capacitors That Are Removed For Periodic Inspection During Electrical Inspection, They Cannot Be Used Again.(2) Even If The Capacitor Is Discharged, A Voltage (Re-Flash Voltage) May Be Generated Between The Terminals. In This Case, Discharge Through A 1kΩ Resistor.(3) The Leakage Current Of Capacitors Stored For More Than Half A Year May Increase. In This Case, Perform Voltage Processing With A 1kΩ Resistor.(4) After Confirming The Rated Value (Electrostatic Capacity And Voltage) Of The Capacitor, Install It.(5) After Confirming The Polarity Of The Capacitor, Install It.(6) Do Not Drop The Capacitor To The Ground. Do Not Use A Capacitor That Has Fallen Behind.(7) Do Not Deform The Capac...
Date: 2019 - 05 - 09
Views:15
Three anti-paint is a special formula of paint, used to protect the circuit board and its related equipment from the erosion of the environment. Three anti-paint has a good resistance to high and low temperature performance; its curing into a layer of transparent protective film, such as chemical substances (such as: fuel, coolant, etc.), vibration, moisture, salt spray, humidity and high temperature Protect the circuit from damage. Under these conditions, the circuit board may be corroded, mold growth and short circuit, etc., with excellent insulation, moisture, leakage, dust, corrosion, anti...
Date: 2017 - 10 - 23
Views:27
On the heels of a regional trade mission to Canada, Governor Larry Hogan has announced that a manufacturer of precision printed circuit boards will open a new manufacturing operation in Maryland. The Ontario, Canada-based CTI America Corp. expects to invest $10 million in the new facility and create at least 80 jobs. The company is working with the Maryland Department of Commerce to finalize a location for its new manufacturing site, which the company expects to have up and running within the next 12 months.“Maryland is the ideal U.S. location to expand our company, with its strong focus on in...
Date: 2017 - 10 - 12
Views:22
Total74ArticlePage7/7HomeLast page1234567Next pageEnd
Copyright ©2005 - 2013 斯雅涂电子制造集团(香港)有限公司
犀牛云提供企业云服务
X
1

QQ设置

4

阿里旺旺设置

5

电话号码管理

6

二维码管理

展开